Tuesday, March 29, 2011

The Septic System

We rented the equipment and Chrys dug the hole for the septic tank and the trenches for the lateral lines this past weekend. It was a job that took a full two days (see previous blog) and Chrys was sure tired by the time it was over. They are suppose to deliver the septic tank tomorrow and then hopefully we won't get to much rain until we get the lateral lines in and ditches filled back in.





No comments:

Post a Comment